Build an equipment acquisition brief

Compare supplier quotes on the cost of getting an asset into service, including delivery, installation and downtime.

Describe the job the asset must do

Start with operating hours, the expected workload and the problem with the current setup. State the minimum capacity required. A machine bought to remove a production bottleneck should be assessed against output after the bottleneck has moved.

Make quotes comparable

Create a line for the machine price, freight, installation, training and any site preparation. Mark each line as included, quoted separately or unknown. Keep one-off costs apart from recurring servicing costs and identify the currency for each quote.

Map the commissioning period

List when the deposit and balance fall due, when installation can begin and when the first saleable output is expected. Include the owner of each dependency. If the existing machine must keep running, record how the changeover will work.

Illustrative example

One supplier includes installation but excludes operator training. A second gives a lower machine price and quotes installation separately. The owner puts the two offers on the same cost sheet before deciding which option to discuss.